Difference between revisions of "Eutrofização Albufeiras"
From MohidWiki
Davidbrito (talk | contribs) (→Where to Start?) |
Davidbrito (talk | contribs) (→Input Data) |
||
Line 8: | Line 8: | ||
==Input Data== | ==Input Data== | ||
+ | |||
+ | List of input data needed: | ||
+ | |||
+ | |||
How to prepare input data see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\1.PreparaInputs | How to prepare input data see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\1.PreparaInputs | ||
Revision as of 20:27, 5 August 2009
Overview
It is intended to produce a step-by-step procedure to run reservoir model CE-QUAL-W2
Where to Start?
- If you need to have first insights on CEQUAL-W2 model, applications already done see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\0.Bibliografia
- If you already feel ready to start, initiate with collecting all the data available for your reservoir and watershed in snirh (www.snirh.pt). First use the shapes in \\datacenter\Albufeiras_Eutrofizacao\Produtos\ProjectosGIS\ShapesBase to check which flow and quality stations are in the reservoir and watershed. Then, go to snirh to download the desired data from that stations.
- Follow the steps in \\datacenter\Albufeiras_Eutrofizacao\ComoFazer
Input Data
List of input data needed:
How to prepare input data see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\1.PreparaInputs
Note It is important to check input data for a) outliers b) detection limit values c) understanding the dynamic. As so, always perform time serie graphs for each property. Also ploting several related properties (e.g. nutrients and chlorofila) will help in understanding the dynamic.
Running the model
In order to see some project examples check \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\2.CorreProjecto\ExemplosHenrique