Difference between revisions of "Eutrofização Albufeiras"
From MohidWiki
Davidbrito (talk | contribs) |
|||
Line 25: | Line 25: | ||
==Support Material== | ==Support Material== | ||
+ | |||
+ | *The kick-off internal meeting video is available at \\datacenter\Albufeiras_Eutrofizacao\Produtos\Apresentacoes |
Revision as of 11:06, 6 August 2009
Contents
Overview
It is intended to produce a step-by-step procedure to run reservoir model CE-QUAL-W2
Where to Start?
- If you need to have first insights on CEQUAL-W2 model, applications already done see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\0.Bibliografia
- If you already feel ready to start, initiate with collecting all the data available for your reservoir and watershed in snirh (www.snirh.pt). First use the shapes in \\datacenter\Albufeiras_Eutrofizacao\Produtos\ProjectosGIS\ShapesBase to check which flow and quality stations are in the reservoir and watershed. Then, go to snirh to download the desired data from that stations.
- Follow the steps in \\datacenter\Albufeiras_Eutrofizacao\ComoFazer
Input Data
List of input data needed:
How to prepare input data see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\1.PreparaInputs
Note It is important to check input data for a) outliers b) detection limit values c) understanding the dynamic. As so, always perform time serie graphs for each property. Also ploting several related properties (e.g. nutrients and chlorofila) will help in understanding the dynamic.
Running the model
In order to see some project examples check \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\2.CorreProjecto\ExemplosHenrique
Evaluating Results
FAQ
Support Material
- The kick-off internal meeting video is available at \\datacenter\Albufeiras_Eutrofizacao\Produtos\Apresentacoes