Difference between revisions of "Eutrofização Albufeiras"
From MohidWiki
Davidbrito (talk | contribs) (→FAQ) |
Davidbrito (talk | contribs) (→Where to Start?) |
||
Line 4: | Line 4: | ||
==Where to Start?== | ==Where to Start?== | ||
#If you need to have first insights on CEQUAL-W2 model, applications already done see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\0.Bibliografia | #If you need to have first insights on CEQUAL-W2 model, applications already done see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\0.Bibliografia | ||
− | #If you already feel ready to start, initiate with collecting all the data available for your reservoir and watershed in snirh ( | + | #If you already feel ready to start, initiate with collecting all the data available for your reservoir and watershed in snirh (http//snirh.pt). First use the shapes in \\datacenter\Albufeiras_Eutrofizacao\Produtos\ProjectosGIS\ShapesBase to check which flow and quality stations are in the reservoir and watershed. Then, go to snirh to download the '''desired''' data from that stations. |
#Follow the steps in \\datacenter\Albufeiras_Eutrofizacao\ComoFazer | #Follow the steps in \\datacenter\Albufeiras_Eutrofizacao\ComoFazer | ||
Revision as of 15:48, 6 August 2009
Contents
Overview
It is intended to produce a step-by-step procedure to run reservoir model CE-QUAL-W2
Where to Start?
- If you need to have first insights on CEQUAL-W2 model, applications already done see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\0.Bibliografia
- If you already feel ready to start, initiate with collecting all the data available for your reservoir and watershed in snirh (http//snirh.pt). First use the shapes in \\datacenter\Albufeiras_Eutrofizacao\Produtos\ProjectosGIS\ShapesBase to check which flow and quality stations are in the reservoir and watershed. Then, go to snirh to download the desired data from that stations.
- Follow the steps in \\datacenter\Albufeiras_Eutrofizacao\ComoFazer
Input Data
List of input data needed:
How to prepare input data see \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\1.PreparaInputs
Note It is important to check input data for a) outliers b) detection limit values c) understanding the dynamic. As so, always perform time serie graphs for each property. Also ploting several related properties (e.g. nutrients and chlorofila) will help in understanding the dynamic.
Running the model
In order to see some project examples check \\datacenter\Albufeiras_Eutrofizacao\ComoFazer\2.CorreProjecto\ExemplosHenrique
Evaluating Results
FAQ
Q: What is the software that I need to install? (CE-qual, GIS, surfer, Office, web-browser...)
A: For Cequal you only will need an .exe file that will be distributed. For the first steps you will need any GIS software that opens shapefiles and georeferenced images (ArcGIS, MohidGIS, etc.). If any doubt on how to install them call David. IE or Mozilla web browser will work just fine in www.snirh.pt
Q: Where do I find data? A: All the data needed up to now is from http://snirh.pt. Water flows in the reservoir, water height and volumes are taken from "Albufeiras" network. However, water quality in the reservoir is taken from "Rios->Dados de base (qualidade)"; this may cause confusion because reservoir data is in river network. Water flow and water quality entering in the reservoir from tributaries are taken from "Rios->Dados de base (qualidade)" and "Rios->Dados de base (quantidade)" - remember to check first which stations are inside the reservoir watershed.
Q: What is the desired period time of the simulation? I'm asking this because I need to know which time-period to filter the data. A: The desired period of simulation is around 10-20 years. The best practice is not to filter data (as much of it e.g. water quality has not yet reached 10 years) because all the data may be needed.
Support Material
- The kick-off internal meeting video is available at \\datacenter\Albufeiras_Eutrofizacao\Produtos\Apresentacoes
- For information about the dam for each reservoir: http://cnpgb.inag.pt/gr_barragens/gbportugal/Lista.htm